Treatment Plant Optimisation

Treatment Plant Optimisation

Treatment Plant Optimisation

With increasing costs for power and effluent discharge, process optimisation through real time, accurate monitoring of COD levels at key points throughout the treatment plant is a necessity.The PeCOD® COD range of analysers will provide critical monitoring information to optimize secondary treatment aeration power requirements and to control COD influent levels for effective management of Biological Nutrient Removal operations.

  • Secondary stage treatment optimisation
  • BNR influent monitoring and control
  • Manufacturing plant optimisation
  • Plant discharge monitoring

Download Application Notes